Stage 2-4 MEP Coordination | Engineered Pixels

Undisclosed Project,
London

^

Client: JA Brooks Mechanical Services

^

Main Contractor: Undisclosed

^

Architect: Undisclosed

^

Consultant: Undisclosed

^

Project scope

An undisclosed project in London is currently being redeveloped as a new prestigious residential building due to open in 2024.

It will include 140 spacious guest rooms and suites, a variety of formal and casual dining and entertainment spaces including five flagship retail spaces.

Engineered Pixels have been working closely alongside JA Brooks and the Design Team to deliver the Stage 5 Coordination and working drawings for the Mechanical & Public Health pipework including vacuum drainage system. Our responsibilities also included production of DfMA module drawings, bracketry setting out & BIM Level 2 deliverables for the Shell & Core services using Revit 2021 with Fabrication CADmep parts.

Consisting of Ground to Level 7 & Roof. Engineered Pixels provided a fully managed digital engineering service to oversee the model and drawing production.

As Lead coordinators on the project for the upper floors, we were responsible for managing the other trades on the project, hosting weekly BIM meetings to ensure final coordination was achieved before the end of the contracted date.

^

13.5 miles of pipe modelled

^

50,301 pipe fittings

^

3,548 pipe supports/hangers

^

201 DfMA Modules

^

Led 100+ meetings

^

Challenges we faced

We provided total of 200 DfMA module drawings for the floors & mechanical risers.

The project was to be modularised as much as possible which meant meticulous coordination with other trades to ensure spacial fit of the frames and to maximise the number of modules per floor.

We provided total of 200 DfMA module drawings for the floors & mechanical risers.

The design included a Vacuum drainage system which is a very specialist system. We had numerous meetings with the specialist to understand the do`s and don’t’s of the system to enable us to coordinate accurately with all other services whilst still ensuring the integrity and correct operation of the system remained un effected. 

^

Our solution

On this project we provided 5500+ hours of support.

The key to the success of this challenging project was the relationship we had developed with JA Brooks and the Design Team. This enabled a lot of the challenges we faced to be quickly dealt with via a quick online Teams meeting or phone call – crucial for a fast paced programme!

This teamed with our proactive and forward thinking approach, we were able to deliver the modelling of the project to our high standard whilst keeping the site team moving with installation drawings and DfMA module drawings for the prefab works.

Overall, a very rewarding project to be involved with.

“Having the opportunity to work on this project has been hugely rewarding for both myself and our project team led by Charlie. The relationship we have built with JA Brooks along the journey is one that I’m sure will continue for years to come.

The proactiveness from both sides has really driven the project and we are proud to put the Engineered Pixels name to it.

Well done all!”

Liam Harris,
Managing Director for Engineered Pixels

^

Why our customers choose us!

With over 150 years combined experience and a genuine passion for what we do, Engineered Pixels are your ideal collaborative partner.

100% UK based Digital Engineering Company

100% UK Based

We're true experts and all our team are based in the UK.

Excellent Reputation in MEP Coordination

Reputation

A solid track record of understanding our clients needs.

MEP Coordination in London, Essex, UK

Honed Process

Successful delivery is proven to save time and money.

M&E Design UK

Expert Support

We'll support you every step of the way with your project.

^